Range Line Road and City Center Drive Roundabout

This project will convert the existing 4-way signalized intersection at City Center Drive and Rangeline Road to a two lane roundabout. The roundabout will tie in to the overall Rangeline Road corridor improvements to the north and south and will feature a dedicated bicycle lane separated from traffic along with updated pedestrian facilities. The project will extend approximately 300 feet to the west along City Center Drive, and approximately 400 feet to the east along 126th Street. The project will consist of new curb and gutter, modification to the existing storm system, updating pedestrian connectivity with multiuse paths, updating the existing signage and pavement markings, and new street lighting. This project will not close the intersection entirely, but will rather be built in phases allowing for vehicular connectivity. The roundabout is currently scheduled to be closed on or after April 24th, 2017 and will be completed July 1st of 2017.


For up-to-date information about this specific project, read the news release(s) from the City of Carmel below: