The existing signalized intersection will be fully reconstructed to a multi-lane roundabout. The reconstruction will include new full-depth pavement, curb and gutter, an enclosed storm water system, sidewalk, and a cycle track with new curb ramps. Any private drives located within the limits of the intersection reconstruction will be replaced. Access to properties within the project limits will be maintained at all times. Once completed, the roundabout will allow access to the new Proscenium project (at the old Party Time site). The intersection will be closed to thru traffic for the duration of construction. The project is anticipated to be constructed in the Fall of 2017.