Towne Road and 106th Street Roundabout

The existing signalized intersection will be reconstructed to a multi-lane roundabout. The reconstruction will include new full-depth pavement, curb and gutter, an enclosed storm water system, shared-use path, and sidewalk with new curb ramps. Two private drives will be reconstructed on the east side of Towne Rd, one north of 106th St and one south of 106th St. Access to all properties within the project limits will be maintained at all times. An approximately 0.2 acre area of additional right of way was acquired from the northwest quadrant (Riley Farms LLC). Existing drainage system from the 2000 intersection improvement project is perpetuated, using many of the existing storm sewers and manholes. The intersection will be closed to thru traffic for the duration of construction, with thru traffic being detoured Ditch Rd, Shelborne Rd, 96th Street, and 116th Street.


View Detour Map PDF (Vehicle)

For up-to-date information about this specific project, read the news release(s) from the City of Carmel below: