PROJECT COMPLETED!

Executive Drive and Range Line Road Roundabout

The existing signalized intersection was fully reconstructed to a multi-lane roundabout. The reconstruction included new full-depth pavement, curb and gutter, an enclosed storm water system, sidewalk, and a cycle track with new curb ramps. Any private drives located within the limits of the intersection reconstruction were replaced. Access to properties within the project limits were maintained at all times. Once completed, the roundabout allowed access to the then yet constructed Proscenium project (at the old Party Time Rental site). The intersection was closed to thru traffic for the duration of construction. The project was completed in the Fall of 2017.


For up-to-date information about this specific project, read the news release(s) from the City of Carmel below: